700~900TPD Gold Beneficiation Plant in Tongguan
Overview
This is a 700~900TPD Gold Mineral Processing Plant in Tongguan, The main equipment of the gold plant includes mineral jig, shaking table, dewatering screen, etc.
- Project Location: Inner Tongguan
- Ore Type: Gold Ore
- Capacity: 700 ~ 900 T/D
- Process: Preparation Process -> Primary Beneficiation Process -> Concentration Process -> Tailings Dry Stacking
PROJECT SITE
MAIN EQUIPMENT
6109 Jig Concentrator
Shaking Table
Shaking Table for Placer Gold Processing gold shaking table
Responses